• Neato
    link
    fedilink
    English
    167 months ago

    I often have a lot of time where nothing needs doing and there’s no meetings. The idea you always have to be working and creating is dumb as it means you always overwork everyone and miss targets. It’s better to have people standing by a % of the time than to be unable to perform when needed. It’s the entire concept of IT as well.