minus-square@[email protected]linkfedilink3•edit-25 months agoA large data centre can use over 100 MW at the high end. Certainly enough to power a swimming pool or three. In fact swimming pools are normally measured in kW not MW.
minus-squareCaptain AggravatedlinkfedilinkEnglish1•5 months ago“A large data centre” this wasn’t. I saw a couple washing machine-sized vats of oil-soaked computers.
minus-square@[email protected]linkfedilink1•5 months agoIf all it’s running is a hot tub that sounds reasonable. This bitcoin miner uses over 3kW: https://www.aozhiminer.com/showroom/high-profit-110th-95th-bitmain-antminer-s19-pro-s19-bitcoin-miner-with-power-supply.html
A large data centre can use over 100 MW at the high end. Certainly enough to power a swimming pool or three. In fact swimming pools are normally measured in kW not MW.
“A large data centre” this wasn’t. I saw a couple washing machine-sized vats of oil-soaked computers.
If all it’s running is a hot tub that sounds reasonable. This bitcoin miner uses over 3kW: https://www.aozhiminer.com/showroom/high-profit-110th-95th-bitmain-antminer-s19-pro-s19-bitcoin-miner-with-power-supply.html