• @halcyoncmdr
    link
    English
    319 days ago

    And the failure that reset that number, IIRC was AMOS-6 (an uncrewed launch), which was still on the pad being fueled for it’s final static fire test before launch. Which wouldn’t put crew in danger anyway since they wouldn’t be onboard for that test. The only reason the satellite was integrated was because the customer chose to have that done before the test to reduce time between the test and launch, IIRC.

    • @NotMyOldRedditName
      link
      6
      edit-2
      19 days ago

      The number is also reset now, just in case you aren’t up to date.

      The 2nd stage failed on a Starlink mission around a month ago. Some problem with a valve that was part of some test measurement equipment that allowed ice to then build up and damage the engine. All satellites were lost as they couldn’t make orbit due to the insertion failure from the engine.