On July 17, the inspector found “green algal growth” in a puddle of standing water in a raw holding cooler. And on July 27, an inspector noted clear liquid leaking out from a square patch on the ceiling. Behind the patch, there were two other patches that were also leaking. An employee came and wiped the liquid away with a sponge, but it returned within 10 seconds. The employee wiped it again, and the liquid again returned within 10 seconds. Meanwhile, a ceiling fan mounted close by was blowing the leaking liquid onto uncovered hams in a hallway outside the room.

A picture of hell.

  • @Kiernian
    link
    174 months ago

    I wonder how much of the state of the place upon that inspection was DUE to:

    The plant has been shut down since late July

    Like, did they say “we’re shutting down” and everyone just fucked off and left the place in a state?

    Or was it just that bad ALL the time?