You always hear the phase “9 to 5” and also the song with the same name. Assuming you include 1 hour worth of breaks (30 minute lunch and two 15 minute breaks), you’re only working for 7 hours a day which comes up to 35 hours a week.

Now it feels like you have to work 8 hours a day (for a total of 40 hours of actual work), plus your other time off meaning you’re really there for 9 hours each day (for a total of 45 hours). Am i looking at that wrong, or did expected times change, and if so, when?

  • @Kelly
    link
    English
    52 months ago

    My time sheet totals 37.5 hours of work per week and I can take take a lunch break of 30 to 60 minutes. The break is unpaid and a minimum break of 30 minutes is required after 5 straight hours of work so the lunch break is mandatory.

    Typically this works out to 7.5 hours work with a 30 minutes break totalling 8 hours on site. Smaller breaks are untimed so if we need to stretch our legs or get some fresh air no one is watching the clock. We also have a pretty good culture of not interrupting people’s lunch with work issues so that does feel like an actual break.