You always hear the phase “9 to 5” and also the song with the same name. Assuming you include 1 hour worth of breaks (30 minute lunch and two 15 minute breaks), you’re only working for 7 hours a day which comes up to 35 hours a week.

Now it feels like you have to work 8 hours a day (for a total of 40 hours of actual work), plus your other time off meaning you’re really there for 9 hours each day (for a total of 45 hours). Am i looking at that wrong, or did expected times change, and if so, when?

  • @[email protected]
    link
    fedilink
    182 months ago

    Most jobs I’ve had will schedule 8-430/9-530/etc, so that you work a full 8 hours but you have a 30min mandatory unpaid lunch break. The two 15 min breaks are paid, but they were also “discouraged.”

    • NoIWontPickAName
      link
      fedilink
      32 months ago

      Man, I have worked some shitty jobs and not one of them as ever discouraged me in any way from taking my breaks.

      Days off is a whole other thing though

      • Drusas
        link
        fedilink
        22 months ago

        Meanwhile, I’ve only ever had one that encouraged taking breaks.

      • @[email protected]
        link
        fedilink
        22 months ago

        I’ve been in construction for many years, and the norm is working straight through till lunch then straight till the end of the day. Usually no one bats an eye if you take a few minutes to catch your breath or smoke if you bust ass, but yeah there typically isn’t a designated 10-15 all stop. That and most guys usually take 20 min to take a shit, so I guess it tends to balance out.

        • @[email protected]
          link
          fedilink
          1
          edit-2
          2 months ago

          To be fair, construction workers get paid a shitload. Fucks your body up though from what I understand.