Finished the final building, finished the walkway/beltway, and wired everything up. This here Reinforced Iron Plate factory campus is complete, save for a final efficiency audit, after it’s done priming.

Quite like how this walkway/beltway came out.

A few shots from inside the final building. I ended up just being plain and simple for the assembler layout. With the exception of needing to do a little cross-balancing of the two wire input lines. This is only the first factory to use assemblers, there’ll be plenty of time to be more fancy in the future.

  • peopleproblems
    link
    214 hours ago

    Jeez I haven’t been there in a long time. Thanks!