It feels like the only talented engineers left at NV are the team who designed the cooler for the 5090. Everyone else cashed out at the 1T plus valuation, and it shows in what they were able to accomplish with a significant bandwidth, core increase and 30% power budget bump. At some point “we’ll sort it out with software” hits a brick wall.
Other than that, those spikes are unremarkable and within spec. Connectors are still going to melt tho, 550-600w sustained is a lot of power.
It feels like the only talented engineers left at NV are the team who designed the cooler for the 5090. Everyone else cashed out at the 1T plus valuation, and it shows in what they were able to accomplish with a significant bandwidth, core increase and 30% power budget bump. At some point “we’ll sort it out with software” hits a brick wall.
Other than that, those spikes are unremarkable and within spec. Connectors are still going to melt tho, 550-600w sustained is a lot of power.