• @[email protected]
    link
    fedilink
    English
    401 day ago

    What’s not covered is the 25 years of R&D in advance of waterfall project starting, or that it’s delivered 200% over time and cost due to those requirements being insufficient and based on assumptions that were never or are no longer true.

    • madjo
      link
      fedilink
      19 hours ago

      But at least the rocket has an opulent ball room as per the design spec