    When considering these externalities for nuclear, you have to do the same for renewables as well. i.e. scrap turbine blades, concrete in dams, weathered PV panels, land use taken up by panels and turbines.

    Remember that the materials used in most renewable generation are also shipped around the world and many have very dirty refining processes.

    I’m a firm renewable energy supporter but you have to be fair to both processes.

    • @schroedingershat
      link
      English
      2
      edit-2
      1 year ago

      Okay.

      Make a PV system out of a strict subset of the materials in the reactor.

      Put the PV system over top of Inkai mine.

      Get more power than the uranium from the mine would produce for longer.

      The 40 year guaranteed lifetime of the panels is longer than the 30 year lifetime of the average nuclear plant at shutdown.

      Your materials can be recycled after.

      The ground around the mine isn’t poisoned with heavy metals permanently,

      This all assuming everything goes perfectly for the nuclear plant and waste disposal.