House built in 1922 with less than 6 ft ceilings. Dug out 100,000 lbs of material and hauled it off in buckets. Took me about 3 months. Now we have 8ft ceilings. Foundation work handled by professional with proper permits.

** progress pics in the replies.

  • Bluewing
    link
    fedilink
    arrow-up
    2
    ·
    17 hours ago

    I give him the benefit of the doubt. I suspect he was using what he had available to him in a time of great need.