The FCC approved 1m Starmind satellites, with the deployment of 100,000 no later than November 2035

US federal regulators approved a constellation of datacenters to process data in space on Wednesday, saying that they would “support America’s booming super intelligence economy”.

The Federal Communications Commission (FCC) said in a statement that regulators had approved 1m Starmind orbital satellites, or compute modules, built by Elon Musk’s SpaceX. It is the first such authorization in US history.

The FCC said that the authorization “promises to bring the human race closer to a Kardashev II civilization – one that can harness the full power of the sun”.

  • Jiral
    link
    fedilink
    arrow-up
    1
    ·
    edit-2
    1 day ago

    Just because in the US they are for whatever reason putting data centres into agglomerations, doesn’t mean that this needs to be like that. There is plenty of cheap land, close enough to power lines and also in cool climate around the world. The “be fast and break” stuff of the tech bubble prevents smart development. They go for bad locations, bad energy source, terrible climate and a lot of other things, just to get some subsidies or be able to rush construction which then gets delayed for other reasons anyway as they are building it an unreasonable and stupid rate, like I said, constructing far too much inferior infrastructure instead of using a proper development and growth curve.

    Most of the problems the AI data centres face are due to that pump and dump scheme instead of well designed expansion plans at a reasonable speed. They have nothing to do with the lack of well suited real estates or lack of power potential.

    Redundancy is an option. You found an aspect where I am less sceptical than you are;) LLMs might lead to different results at repeated calculations, but mathematical operations are reproducible. So they can be made redundant on a low operational level. Also a main issue are bit flips in memory. That can be prevented by redundant memory. This might be at the cost of speed and bandwidth however, so comes at a high cost. That aside, there is the simple fact that triple redundancy basically means tripling consumption cooling demands, more or less tripling required launches etc. At that point electricity production on earth with no redundancy will more or less catchup with electricity production in space and that is like I said the only strong benefit from having it in space. Unless the main point of these is really to evade legislation and do illegal stuff (might be foolish because while the data rack would be in space, the company would be down on earth and subject to local laws).

    • NotMyOldRedditName
      link
      fedilink
      arrow-up
      1
      ·
      1 day ago

      Like I said, I’m curious how they’re going to solve the chip issue.

      And you’re right, if we went a lot slower, we could plan much better sites, and even do things like have the waste heat, heat the nearby infrastructure. We could even build the infrastructure around them at the same time to plan the usage of that waste heat.

      • Jiral
        link
        fedilink
        arrow-up
        1
        ·
        1 day ago

        Don’t get me wrong. I am curious as well. Unlike a big data centre in space, those “compute racks” of maybe 100 kW continues compute in space are a doable concept, in principle. I doubt the are a reasonable concept but they are likely doable.

        A main issue I see is that inference hardware has been absolutely not designed for the very problematic conditions in space. I think we have seen some consumer electronics being used in the ISS, and that has worked somewhat okish. But bit flips are an issue and in the case of the South Atlantic Anomaly, the high radiation goes all the way across Low Earth Orbit, maybe that sizable part of the orbit will be avoided by those satellites, I don’t know. Maybe this can be handled reasonably well with only appropriate memory, maybe redundant memory. I am not an expert either.

        If this where a prototype system where they figure that out, I would not even be so negative. But the fact that they already plan a huge system and try to get mountains of money for it, when they don’t even have a single demonstration system and everything is just guesswork is madness and a sign of how the tech investment system has gone completely off the rails. The way it is done now is like Hyperloop all over again (also a system that is technically possible but not reasonable)

        • NotMyOldRedditName
          link
          fedilink
          arrow-up
          1
          ·
          24 hours ago

          But the fact that they already plan a huge system and try to get mountains of money for it, when they don’t even have a single demonstration system and everything is just guesswork is madness and a sign of how the tech investment system has gone completely off the rails.

          This made me laugh and is so true.