• @Mirshe
    link
    English
    11 year ago

    Is this not two lanes with curbside parking?

    • @curveOPM
      link
      English
      11 year ago

      When I said option 4 I meant this- https://www.centralparkwaycincinnati.org/_files/ugd/e63c00_a44f657037404c79826efadb47ccfb8b.pdf

      I count it by total lanes so 4 total (though if you did count parking it’d be more but since it’s permanent parking it appears then I wouldn’t call that a lane.)

      One thing I did leave out is that I really like that they are looking into doing grade separated cycling paths. That’s a big improvement over everything we currently have. That and pretty separate from actual traffic.

      • @misterztrite
        link
        English
        11 year ago

        When I looked at the proposals and when I got to number 4 I thought yep, the other three are there to get people to choose number 4.