Battery trains will begin operating each hour between Liverpool Central and Headbolt Lane.

The battery technology removes the need for a live third rail, which could enable the Merseyrail network to run in places previously inaccessible, including as far as Manchester, Wrexham, Warrington, Preston and Runcorn.

Exciting development!

  • RentlarOP
    link
    fedilink
    English
    11 year ago

    Overhead catenary and 3rd rail power are solutions for many popular electricified lines, but it’s a major capital cost that may not make sense everywhere, at least at first. You’d need a whole distribution and transformer systems, where historically usage might have been a handful of trains a day.

    I’m hoping large-capacity battery technology can improve so that we can see more trains and planes powered solely by electricity over longer distances.

    • @[email protected]
      link
      fedilink
      English
      31 year ago

      Batteries might work on short, infrequent, local lines. But any long distance route should have wire put in, it saves significant costs over diesel or batter operation, and as soon as a service becomes decently frequent (every hour or whatever) electrification makes more sense form an economic and environmental perspective.

      • @[email protected]
        link
        fedilink
        English
        31 year ago

        This is inaccurate for the UK. A lot of the lines have tunnels (e.g. along to Holyhead) or have geography (e.g. CVL) or planning issues that makes electrification of the whole line much more expensive. By contrast, if you have bi or trimodal trains you can electrify the easy parts while avoiding the high cost parts, which means you can roll out the electrification of the easy bits so much quicker.

      • RentlarOP
        link
        fedilink
        English
        2
        edit-2
        1 year ago

        Right, but the fact that most services where this is applicable will not be frequent such as in Canada, parts of the US, rural EU/UK, and elsewhere in the world, though winter performance may still need significant improvements.

        Some trains already operate on hybrid power where the diesel-electric generator gives power where there are no wires and then switches to fully electric where there are. A sufficiently capable battery would just be a variation of that, and be relatively easy to implement, instead of or alongside with track electrification.

        • @[email protected]
          link
          fedilink
          English
          21 year ago

          Also means you can get some of the merseyrail services running all the way to Crewe, meaning fewer changes and better connectivity (though now HS2 is cancelled, how much benefit that will actually bring is in question).