minus-squareFuck spezlinkfedilinkEnglish2•1 year agoThanks, that’s encouraging. So is it the roof construction, grid connectivity, or both that requires permits?
minus-square@[email protected]linkfedilinkEnglish2•1 year agoConstruction, electrical work, grid connection, sometimes architectural review to ensure the result isn’t ugly, etc etc
Thanks, that’s encouraging. So is it the roof construction, grid connectivity, or both that requires permits?
Construction, electrical work, grid connection, sometimes architectural review to ensure the result isn’t ugly, etc etc