Roman Chervinsky, a colonel in Ukraine’s special operations forces, was integral to the brazen sabotage operation of the Russia-Germany pipeline, say people familiar with the planning.

  • Sir_Osis_of_Liver
    link
    fedilink
    01 year ago

    Vogtle ended up at roughly $13,000/kW. On shore wind globally is averaging roughly $1,300/kW. Grid-scale batteries are running roughly $3,000/kW, then add in for how much ride-through you expect to need.

    Depending on local conditions, you can build out 10x as much wind capacity as you need, or various combinations of wind + solar+ batteries and still end up less expensive and with a faster deployment time than nuclear.