• @[email protected]
    link
    fedilink
    English
    21 year ago

    I mean separately. Why limit it to a single charging system? What if you had 2 (DC) charging ports, each capable of only charging half of the cells? Many heavy duty trucks have 2 gas tanks, each with a separate fuel door. They can be filled by 2 pumps simultaneously, cutting refueling time in half. What about 4? 10?

    Obviously there would be downsides (cost being a big one), but it would enable faster charging.

    • @[email protected]
      link
      fedilink
      21 year ago

      I mean, this is still more or less what the fast charging standards do; they’re pouring more power into it faster with higher bandwidth cables and sectioned charging.

      The level 3 fast charger is basically the equivalent of 4 power cords from your wall. Also, adding more and more hardware and things for it will effectively make the electronics more complicated, which means more expensive, difficult to manufacture and repair

      But also, as you scale this up more and more you’ll start running into issues that make it difficult to start pulling more power; energy from the grid isn’t infinite