Corrections has spent over $305,000 on slushy syrup and maintaining frozen ice machines in the past six years.

The news comes as proposed job cuts ravage the public service with 3460 jobs set for the chopping block, as part of the cost savings drive.

The slushy machines caused controversy in 2019 when it was revealed Corrections had spent over $1 million of taxpayer money on 193 slushy machines.

The then-National leader Simon Bridges called it “irresponsible and wasteful spending” at the time but then-Corrections minister Kelvin Davis said was about health and safety.

Since then the slushy fund has continued with 160 of the 193 original machines still in use and $305,906 spent on syrup, maintaining them.

  • @[email protected]OPM
    link
    fedilink
    25 months ago

    We have about 8,000 prisoners. That’s 300k per year per prisoner?

    Figures I’ve heard previously were more like $150k so I guess Corrections spends a lot outside of prisons?

      • @[email protected]OPM
        link
        fedilink
        35 months ago

        Yes that makes sense. I also wonder if that budget includes funding for rehabilitation programmes.

        • @[email protected]
          link
          fedilink
          35 months ago

          I assume so, hence “corrections” rather than “incarceration” being the department name ;-)

    • Rimu
      link
      fedilink
      2
      edit-2
      5 months ago

      I don’t know an intra-departmental breakdown. That might take some digging.

      In the interest.co.nz article I linked to earlier it has a figure of $1.7bn for the year 2017. Big increases in 2018 and 2020. Labour invested heavily in prisons!

      • @[email protected]OPM
        link
        fedilink
        15 months ago

        Weird because there were also huge drops in prison population under Labour! Was down from something like 10k to 7k off the top of my head.

        But also that’s operational costs not capital investment, so probably not so much investing in prisons and more just an increase in costs.

        That’s an increase of about 6% per year assuming 1.7 in 2017 and 2.4 in 2023. High but not crazy considering what’s happened in that time.