The plan was to leave the 3/4 inch wood embedded in the poured concrete, but this will be tiled, and I’m wondering if the concrete might crack if the wood expands. If necessary, I can pry them out and fill the space after it sets.
And yes, I know self-leveling means this shouldn’t be necessary, but it never seems to work out that way in practice.
You must log in or register to comment.