• slazer2au
    link
    fedilink
    English
    arrow-up
    12
    ·
    3 months ago

    Power problems are for building maintenance not IT.

    • Onomatopoeia@lemmy.cafe
      link
      fedilink
      English
      arrow-up
      4
      ·
      3 months ago

      At the moment, for sure.

      I just hope the UPS’s hold up until the generators start, and that everything was properly connected to the appropriate power.

      • slazer2au
        link
        fedilink
        English
        arrow-up
        2
        ·
        3 months ago

        That is what 6 month testing is for.

        An untested backup isn’t a backup.

  • danekrae
    link
    fedilink
    arrow-up
    8
    ·
    3 months ago

    I feel like this would be the equivalent to if non of my students showed up to class.

  • Lucky_777
    link
    fedilink
    arrow-up
    1
    ·
    3 months ago

    Sure, this is maintenance, but if they aren’t faster than the UPS and generator cutover (if those even exist). Then it is your problem.

    Depending on size of company and equipment. This could be an all day exercise.