• @[email protected]
    link
    fedilink
    2811 months ago

    I sincerely hope this will happen instead of the funds just disappearing without accountability. More rails are always worth supporting.

  • @[email protected]
    link
    fedilink
    811 months ago

    Is it proper normal highspeed rail, or is it an idiotic Musky vactrain, or solar frickin railways, or perhaps a entrepeneur will design a flooded underground tunnel systems where submarines are transporting passengers?

    • @[email protected]
      link
      fedilink
      9
      edit-2
      11 months ago

      1435 mm, 25kV (AC, Overhead) double track with grades of up to 4.5%, Ø: 165 km/h, Top: 300 km/h, EMU (likely Siemens Velaro Novo (ICE S in Germany), but AFAIK, has to be built in the US)

  • @[email protected]
    link
    fedilink
    511 months ago

    Nice way to waste 3B dollars.

    I’m sure the casino owners really appreciate it. Let them subsidize this nonsense.

    Vegas shouldn’t exist. It’s a freakin desert.

    • @HappycamperNZ
      link
      511 months ago

      Or realise that I’d rather it went in somewhere it was being used, rather than not going into the perfect place for it

  • @LilDumpy
    link
    111 months ago

    Would be cool if it bypassed the Cajon pass.