• @[email protected]
    link
    fedilink
    16 months ago

    Nuclear is nothing bog standard. If it was, it wouldn’t take 10 years. Almost every plant is a boutique job that requires lots of specialists. The Westinghouse AP1000 reactor design was meant to get around this. It didn’t.

    The experts can stay where they are: maintaining existing nuclear power.

    Renewables don’t take much skilled labor at all. It’s putting solar panels on racks in a field, or hoisting wind blades up a tower (crane operation is a specialty, but not on the level of nuclear engineering).

    • @someacnt_
      link
      2
      edit-2
      6 months ago

      I mean, it seems normal for big structure constructions to take 5 years at least…

      About bog standard construction, I meant not standardized nuclear, but that many parts of it is just constructions

      • @[email protected]
        link
        fedilink
        26 months ago

        And 5 years is what nuclear projects have promised at the start over the years. Everyone involved knows this is a gross lie.

        • @someacnt_
          link
          26 months ago

          I guess you are talking about US, since 5 years is standard from beginning constructions.

          • @[email protected]
            link
            fedilink
            16 months ago

            China built a few Ap1000 designs. The Sanmen station started in 2009 with completion expected in 2014 (2015 for the second unit). It went into 2019. The second, Haiyang, went about the same.

            This is pretty similar to what happened in the US with Volgte.

            • @someacnt_
              link
              26 months ago

              Interesting, that was not what happened in my country. Sometimes it does take 8 years from allowance to finishing, but that’s it.