@llamacoffeeM to [email protected]English • 3 months agoNASA has to be trolling with the latest cost estimate of its SLS launch towerarstechnica.comexternal-linkmessage-square5arrow-up132arrow-down10cross-posted to: [email protected]
arrow-up132arrow-down1external-linkNASA has to be trolling with the latest cost estimate of its SLS launch towerarstechnica.com@llamacoffeeM to [email protected]English • 3 months agomessage-square5cross-posted to: [email protected]
minus-square@[email protected]linkfedilinkEnglish2•3 months agoleast incompetent old space contractor
minus-square@[email protected]linkfedilinkEnglish2•3 months agoSeriously. Bechtel fucked up Boston’s Big Dig by a few billion too.
minus-squarethreelonmusketeersMlinkfedilinkEnglish1•edit-23 months agoDoes “least incompetent” = “most competent”? I’m not that familiar with Bechtel.
least incompetent old space contractor
Seriously. Bechtel fucked up Boston’s Big Dig by a few billion too.
Does “least incompetent” = “most competent”? I’m not that familiar with Bechtel.