Summary

France’s Flamanville 3 nuclear reactor, its most powerful at 1,600 MW, was connected to the grid on December 21 after 17 years of construction plagued by delays and budget overruns.

The European Pressurized Reactor (EPR), designed to boost nuclear energy post-Chernobyl, is 12 years behind schedule and cost €13.2 billion, quadruple initial estimates.

President Macron hailed the launch as a key step for low-carbon energy and energy security.

Nuclear power, which supplies 60% of France’s electricity, is central to Macron’s plan for a “nuclear renaissance.”

  • @[email protected]
    link
    fedilink
    English
    9
    edit-2
    23 hours ago

    I know just about noting about nuclear fuel cycles, but yes, more plutonium sounds exactly like what the French want. They have an arsenal to feed.

    • @gaael
      link
      English
      1222 hours ago

      The military nuclear is the main reason behind our civilian nuclear infrastructure, which was planned during the cold war. It looks like once per century the military can have an unintended positive effect, yay.

        • @gaael
          link
          English
          143 minutes ago

          Don’t get me wrong, I’m in no way advocating for military nuclear (or even for anything military).

    • raoul
      link
      fedilink
      English
      522 hours ago

      France stopped production of military fuel 30 years ago.

      The current goal is about recycling the existing nuclear waste, to reduce the need for long term storage and natural uranium.