cross-posted from: https://aussie.zone/post/29742117

The “big switch” has ended up being a lot less big than originally promised. I’m really happy we now have a turn up and go service - or at least every 10 minutes - on the lines going through the Metro Tunnel (the Munnel), but feels really silly we haven’t brought more drivers on board to run services at least every 10 minutes across the network, and upped all bus routes to the same frequency.

There’s a great map that Taitset made showing sections of the metro network which could already do 10 minute running.

My mum, who’s in her late 60s, told me of growing up in [European city]. She interchanged 2 times between 2 trains and a bus on her way too highschool. Her and her friends didn’t like the bus because it only came every 10 minutes. In the 1970s.

It’s a bit embarrassing to me how bad our frequency is, given our massive population.

It would be great if we could convince our government or MPs holding the balance of power at the next state election to invest in a larger workforce to achieve the frequency PTV needs to thrive.

Keen to hear others thoughts on the “Big Switch”.

P.S. I’ve talked to multiple colleagues who live on the lines who literally didn’t know about the “Big Switch” until I told them about it, 2 days beforehand.

  • phant
    link
    fedilink
    arrow-up
    2
    ·
    3 days ago

    Increased frequency is good, but on the Hurstbridge line I’d take improved reliability.

    • MisterFrog@aussie.zoneOP
      link
      fedilink
      arrow-up
      2
      ·
      3 days ago

      If it’s to do with all the bus replacements, it pains me to tell you that that’s all been for car infrastructure on the Hurstbridge line, in the last couple years 😅 (mostly)

      https://youtu.be/VdwYdMF4nMs?t=983

      (Video URL links to timestamp 16:23 about the real reason for all the bus replacements on the Hurstbridge line)

      • phant
        link
        fedilink
        arrow-up
        2
        ·
        2 days ago

        Haha yeah, the rail duplication followed immediately by the North East link works has been fairly brutal for the outer Hbridgers. But I get more annoyed by frequent track faults and trespassers etc. Can’t plan around those and they happen often enough to leave me with trust issues haha.