• @gegs
    link
    English
    01 year ago

    From plan to production is not 7 years, just the building itself. Especially not now that cooling capabilities are disappearing (many of those French installations had to reduce output significantly due to the heat wave this year.) This will mean it will cost much longer to get these installations okayed and their usefulness is further limited.

    Calling me an ecofacist also means this is the end of the line of this “discusssion”. Have fun in your alternate reality.

    • @bouh
      link
      English
      11 year ago

      I’m not calling you an ecofascist. You put yourself in this category because you are so radically against nuclear I guess.

      And you’re denying facts. And making hypothesis about the future. The output reduction last year was exceptional, a combination of factors. It’s as likely, if not less, as a Europe scale meteorological event that alter the output of solar and wind on the whole continent.