• @[email protected]
    link
    fedilink
    English
    51 year ago

    Ignorant on the levels, but I thought I read it WAS crazy to install all that infrastructure. Gas stations apparently struggle to get it done.

    Maybe I read about the next level

    • @[email protected]
      link
      fedilink
      English
      61 year ago

      Level 3 fast chargers (the kind you would want at a gas station) are legitimately difficult to arrange infrastructure for in some areas. Multiple 200+ kW loads are not something that many properties are wired for. It’s an enormous investment.

      Level 2 chargers are basically trivial to install in comparison and can be supported just about anywhere with two phase service. They’re much slower than level 3 chargers, but are a great option for any place that people stop with the intent to stay for an hour or more. Workplaces, restaurants, shopping malls, etc.