• @[email protected]
      link
      fedilink
      English
      -21 year ago

      There are technology (reactor) demonstrations planned within the next 2-3 years, so not quite but very close. A lot of active R&D work going on right now for specific designs at a lot of companies.

        • @[email protected]
          link
          fedilink
          English
          -21 year ago

          The technologies on which these reactor designs are based have been demonstrated previously. The specific designs are in progress and well on their way. AGR, EBR-II, and MSRE are examples.

          • @IchNichtenLichten
            link
            English
            11 year ago

            So that’s a no, then?

            WTF is it with nuclear bros and their war on reality?