Boeing Whistleblower: Production Line Has “Enormous Volume Of Defects” Bolts On MAX 9 Weren’t Installed::A reader at respected airline industry site Leeham News offered a comment that suggests they have access to Boeing’s internal quality control systems, and shares details of what they saw regarding the Boeing 737 MAX 9 flown by Alaska Airlines that had a door plug detach inflight, causing rapid decompression of the aircraft. The takeaway appears to be that outsourced plane components have so many problems when they show up at the production line that Boeing’s quality control staff can’t keep up with them all.

  • @[email protected]
    link
    fedilink
    English
    1310 months ago

    Time to start arresting people at the top and work your way down. Also Pete Buttigieg needs to answer why it has taken so long for the grounding of the 737 Max 9.

      • @TrueStoryBob
        link
        English
        210 months ago

        Yeah, I’m not a fan of Mayor Pete by any stretch of the imagination, but they were quick to ground these.