Stenciling says “6 & 7TH / PDE & 3RD” It’s the only pink tie on this track.

  • Dr. Bob
    link
    fedilink
    English
    1610 months ago

    It appears to have been painted after it was placed and after the track was laid. If you zoom you can see the paint does not run under the rails. Also there is paint on the rail clip that ties the rail to the sleeper. The bolted connection is called a fish plate I think.

    • @I_Fart_GlitterOP
      link
      English
      110 months ago

      That’s a good point. I was wondering how I’d walked past this so many times and not noticed a hot pink railroad tie before. Looking closer, there is even a stray rock in the middle of the tie that also go painted pink, so I think it was pretty recent.