• @[email protected]
    link
    fedilink
    38 months ago

    If the timing is critical then the only reasonable solution is to cut scope and features until it fits.

    The triangle isn’t a rubbery floppy thing, it is iron!

    • @[email protected]
      link
      fedilink
      18 months ago

      They fully subscribed to the mythical man month. So they just threw bodies at it and then couldn’t understand why the project got slower.

      • @[email protected]
        link
        fedilink
        28 months ago

        I don’t understand your statement. The Mythical Man Month teaches exactly that lesson of more bodies != Faster in many cases.

        How long to build the site with 1 full stack dev? 1.5 years.

        How long with an existing high performance team of 5? 2 months.

        How long if you hire 4 plus the one original (all qualified)? 1 to 1.5 years.

        How long if we hire 30 full stack devs? Maybe never.

        • @[email protected]
          link
          fedilink
          18 months ago

          Poorly worded on my part.

          They fully bought into the idea of the man-month without realising it was mythical.

          • @[email protected]
            link
            fedilink
            28 months ago

            You know? I literally figured that out a minute before I saw your reply. And I rolled my eyes at myself.

            That makes sense. Silly me

            Cheers