• @Chickenstalker
    link
    219 months ago

    The 737 design has reached its max (heh) potential. There’s no more milk to squeeze out from this cow. Boeing has to bite the bullet and design a new plane from the ground up. Surely those billions in tax payer funded military contracts can be invested in R&D.

    • @MataVatnikOP
      link
      99 months ago

      The execs already plundered and pocketed all of the money

    • kase
      link
      5
      edit-2
      9 months ago

      from the ground up

      hehe :)

  • @The_v
    link
    209 months ago

    4 years later around 150 new airplanes are still sitting on the tarmac as the crews fix around 6-7 per month.

    It’s pretty bizarre to drive past where they store/repair them in Moses Lake and see them all.

    • @MataVatnikOP
      link
      39 months ago

      Didn’t know, are they planes that never sold? Or were grounded? Or just don’t have the resources to repair them?

      • @The_v
        link
        49 months ago

        Mostly still grounded planes in need of repair.

        There are a few planes that were ordered by Russia and Ukraine that can not be delivered due to the war. There are also a few planes that are unsold.

  • @[email protected]
    link
    fedilink
    129 months ago

    Not to be the Ackchyually guy here but producing aircrafts unfit for flying already emits a lot of greenhouse gases.

    • @MataVatnikOP
      link
      139 months ago

      Fake news, these planes are made of renewable materials, such as cardboard and greed.