It was billed as a futuristic, glass-walled city, but was only ever realised in the digital sphere – where it should remain

  • @[email protected]
    link
    fedilink
    English
    197 months ago

    It was billed as a futuristic, glass-walled city, but was only ever realised in the digital sphere – where it should remain

    • Transporter Room 3
      link
      fedilink
      English
      57 months ago

      It was billed as a futuristic, glass-walled city, but was only ever realised in the digital sphere – where it should remain

      It was billed as a futuristic, glass-walled city, but was only ever realised in the digital sphere – where it should remain

      • @[email protected]
        link
        fedilink
        English
        47 months ago
        :

        It was billed as a futuristic, glass-walled city, but was only ever realised in the digital sphere – where it should remain

        • @lemmy_at_em
          link
          English
          37 months ago

          SPOILER WARNING!!! It was billed as a futuristic, glass-walled city, but was only ever realised in the digital sphere – where it should remain.

  • @[email protected]
    link
    fedilink
    English
    67 months ago

    Wasn’t there going to be multiple underground subway lines to transport people and goods across the length of it?

    Be hardly worth it for a 1.5 mile run. Maybe they’ll switch to pedicabs.

  • @[email protected]
    link
    fedilink
    English
    -12
    edit-2
    7 months ago

    It was always planned to be built in small stages… Why would anyone think they would start a 105 mile project all at once?? That’s insane

    This is like looking at a 50 story building after just the first few floors are built and saying “well is fallen short by 47 floors, guess it’s a big flop”

    • BrikoXOPM
      link
      fedilink
      English
      197 months ago

      The project is being scaled back, not paused until existing sections can be completed.

      • @[email protected]
        link
        fedilink
        English
        -17 months ago

        Yes but you seem to be mixing up 2 parts of their statements … The one you linked is paywalled so I’m not sure if it’s what’s saying it, but if you look at their original statement, the scale back and the 2.4km were two seperate parts

        They expect 2.4km to be completed by 2030

        They scaled back the total excepted population from 1.5m to 300k

        That means the total excepted length should still be much longer than 2.4km because I believe it’s still expected to connect to the airport which is over 10km from the current stage

        • BrikoXOPM
          link
          fedilink
          English
          67 months ago

          Developers are already firing workers, the “scaled back” wording is just a nice way of saying they fucked up and now have to find a way to graciously abandon the project. There are parts of the Neom project that are viable, but the Line was always a pipe dream that’s not based in reality.

          And even if they try to force a plan to expand it past 2.4km, with the project scope being reduced 5 times it actually creates existential issues, not just lowers the amount of people that it can house. By the project’s own description, for it to work it needs to have everything integrated proportionally and when you scale it down 5 times, half the life sustaining systems won’t be able to operate.