• ShadowRam
    link
    fedilink
    44 days ago

    600km… yeah but hauling how much weight?

    Overhead Wires on long haul highways from distribution centre to distribution centre.

    Battery for the last mile…

    Or batteries need to be hot-swappable, or make them apart of the trailer.

    Sitting in a yard charging while waiting for pick up.

    • @[email protected]
      link
      fedilink
      114 days ago

      What would be even better than overhead wires on long haul highways would be overhead wires over rail!

      • @[email protected]
        link
        fedilink
        64 days ago

        now that idea is just too crazy to imagine. it sounds too much like a technology of the future…

      • @momocchi
        link
        54 days ago

        I was about to say if we keep going down the overhead wire route we’ll just end up reinventing the train

      • threelonmusketeersOPM
        link
        fedilink
        English
        23 days ago

        Rails preclude the “last mile delivery” though. A BEV lorry with a pantograph could do both.