• Troy
    link
    fedilink
    English
    102 days ago

    Yeah, but like, the shuttle was cool man.

    In retrospect, it wasn’t the best idea, but it’s probably the most complicated flying brick anyone has ever conceived and it somehow worked, most of the time.

    But imagine you could go back and redesign it. Payload bay doesn’t have to fit keyhole satellites. Don’t have to use SRBs as a jobs program for ICBM contractors. They use a fuel that isn’t as nasty to handle as hydrogen. It gets stacked vertically. Oh wait – I just designed Starship, minus the reusable booster.

    • Dave T-W
      link
      fedilink
      41 day ago

      @troyunrau @llamacoffee It was cool, but that was it’s downfall. Apollo took every bit of technical resource, which might have otherwise gone into a more natural growth of activity in space. (Which is what we’re seeing now).
      So when someone showed a cool space plane, regardless of the costs, practicality and viability, that pattern of political expediency was already set.

    • Pennomi
      link
      English
      82 days ago

      The asymmetric design terrifies me. Fuel tank on the side? Absolutely bonkers. And yet it totally worked.

      • threelonmusketeersM
        link
        fedilink
        English
        61 day ago

        Fuel tank on the side? Absolutely bonkers.

        And not just on the side, but the heatshield side. In retrospect, it’s possible that designing it so the heat shield faced outward (further from any falling insulation) might have been safer.

        And yet it totally worked.

        Well, it mostly worked. 133/135 ain’t bad, but statistics hit different for crewed vehicles.

        • Troy
          link
          fedilink
          English
          31 day ago

          My understanding is that the payload bay had to be accessible while stacking, so tank on the other side wouldn’t work.

  • @[email protected]
    link
    fedilink
    English
    72 days ago

    15 million per rocket launch is actually really not bad at all. If it can fit 40 satellites, then that’s $375,000 per satellite. And if it can fit 60 satellites, then that’s $250,000 per satellite.