I have a 4bd/2ba that I want to add another bathroom to. There is a small “office” (it’s not big enough to be considered another room) that I would like to convert to said bathroom. The two existing bathrooms are right next to each other in the rear of the house and the water cutoff is in front of the property, on the sidewalk.

What considerations would I need to worry about with a project like that? We don’t want to go septic.

  • @Bakachu
    link
    71 year ago

    Not a super thorough answer but if you’re thinking about a full bathroom vs a half, one thing that may come up is the current size of your water heater and the size of your family. 3 showers running simultaneously and/or water appliances may warrant getting a larger size heater which will add to the price of the project.

    • @SecretSaucesOP
      link
      21 year ago

      It’s gonna be a full bathroom, though it will be tight quarters. The water heater is something I hadn’t thought of though. So thanks for bringing that up.

      • @Bakachu
        link
        11 year ago

        Full bath- nice. Bonus option if you go with a new water heatee: tank vs tankless. Good luck with your renovation.

  • @jrr2ok
    link
    41 year ago

    You haven’t commented on whether the house is on a slab or basement/crawlspace. The sewer consideration would be my #1 concern, and ripping into a slab would be a dealkiller for me.

    • @SecretSaucesOP
      link
      11 year ago

      Unfortunately, its on a slab. We don’t really have room for basements here in South Florida.

  • @bestnerd
    link
    41 year ago

    I would add to the other commenter, making sure the cost to plumb and run into existing sewer and water is worth it.

  • @SupraMario
    link
    21 year ago

    It’s not a big deal, pex and sewage line into the existing, assuming this is one story home, if bathroom is upstairs then it’s a little more involved. Plumbing isn’t going to be the hard work, that stuff is easy. It’s converting a room into a bathroom with tile and tub/sink/toilet that will take much longer than just running water and plumbing.