Intel’s 916,000-pound shipment is a “cold box,” a self-standing air-processor structure that facilitates the cryogenic technology needed to fabricate semiconductors. The box is 23 feet tall, 20 feet wide, and 280 feet long, nearly the length of a football field. The immense scale of the cold box necessitates a transit process that moves at a “parade pace” of 5-10 miles per hour. Intel is taking over southern Ohio’s roads for the next several weeks and months as it builds its new Ohio One Campus, a $28 billion project to create a 1,000-acre campus with two chip factories and room for more. Calling it the new “Silicon Heartland,” the project will be the first leading-edge semiconductor fab in the American Midwest, and once operational, will get to work on the “Angstrom era” of Intel processes, 20A and beyond.

I don’t know why, but I’ve never thought of the transport logistics involved in building a semiconductor fabrication plant.

  • @foggy
    link
    English
    -117 days ago

    Their stock is basically on sale right now. And the feds are throwing billions at them…

    🤑

    • @Maggoty
      link
      English
      316 days ago

      Wait, for real? Because they just grabbed a giant defense contract. That stock should be a pretty safe long term bet now.

      • @foggy
        link
        English
        216 days ago

        I’m sayinnnm

        Daddy Warbucks has likely got Intel and Boeing’s back. And something about the current air smells awfully war-y.

        Boeing hasn’t fallen as far as I’d hoped though.

        I wouldn’t trust me though. I’m a doofus on the internet.

        • @ulkesh
          link
          English
          115 days ago

          I’m a doofus on the internet.

          We’re all doofuses here. You’re in good company!