decadentrebelM to PhilippinesEnglish • 1 year agoMetro Manila Subway Project excavation/boring between Valenzuela and Quirino Highway stations are expected to be completed by Dec 2023 or Jan 2024imagemessage-square7arrow-up112arrow-down10file-text
arrow-up112arrow-down1imageMetro Manila Subway Project excavation/boring between Valenzuela and Quirino Highway stations are expected to be completed by Dec 2023 or Jan 2024decadentrebelM to PhilippinesEnglish • 1 year agomessage-square7file-text
minus-square@[email protected]linkfedilinkEnglish3•edit-21 year agolmao these expected dates isn’t remotely true. San Miguel expects to complete the 23-kilometer elevated railway (MRT7) from North Avenue in Quezon City to San Jose del Monte in Bulacan “by 2020.” I think mrt7 will open at 2025 when looking at the state it is currently in.
minus-squaretheyawnerlinkEnglish3•1 year agoOn the other hand, below grade construction doesn’t have the same issues as at grade/above grade construction. Securing land is mostly just an issue with station locations.
minus-square@[email protected]linkfedilinkEnglish2•1 year agoI guess that’s a positive note, hopefully it doesn’t get delayed too much like other infrastructure projects.
lmao these expected dates isn’t remotely true.
San Miguel expects to complete the 23-kilometer elevated railway (MRT7) from North Avenue in Quezon City to San Jose del Monte in Bulacan “by 2020.”
I think mrt7 will open at 2025 when looking at the state it is currently in.
On the other hand, below grade construction doesn’t have the same issues as at grade/above grade construction. Securing land is mostly just an issue with station locations.
I guess that’s a positive note, hopefully it doesn’t get delayed too much like other infrastructure projects.