decadentrebelM to PhilippinesEnglish • 1 year agoMetro Manila Subway Project excavation/boring between Valenzuela and Quirino Highway stations are expected to be completed by Dec 2023 or Jan 2024imagemessage-square7arrow-up112arrow-down10file-text
arrow-up112arrow-down1imageMetro Manila Subway Project excavation/boring between Valenzuela and Quirino Highway stations are expected to be completed by Dec 2023 or Jan 2024decadentrebelM to PhilippinesEnglish • 1 year agomessage-square7file-text
minus-squaretheyawnerlinkEnglish3•1 year agoOn the other hand, below grade construction doesn’t have the same issues as at grade/above grade construction. Securing land is mostly just an issue with station locations.
minus-square@[email protected]linkfedilinkEnglish2•1 year agoI guess that’s a positive note, hopefully it doesn’t get delayed too much like other infrastructure projects.
On the other hand, below grade construction doesn’t have the same issues as at grade/above grade construction. Securing land is mostly just an issue with station locations.
I guess that’s a positive note, hopefully it doesn’t get delayed too much like other infrastructure projects.