• @General_Effort
    link
    English
    43 months ago

    From the source:

    Our primary approach calculates training costs based on hardware depreciation and energy consumption over the duration of model training. Hardware costs include AI accelerator chips (GPUs or TPUs), servers, and interconnection hardware. We use either disclosures from the developer or credible third-party reporting to identify or estimate the hardware type and quantity and training run duration for a given model. We also estimate the energy consumption of the hardware during the final training run of each model.

    As an alternative approach, we also calculate the cost to train these models in the cloud using rented hardware. This method is very simple to calculate because cloud providers charge a flat rate per chip-hour, and energy and interconnection costs are factored into the prices. However, it overestimates the cost of many frontier models, which are often trained on hardware owned by the developer rather than on rented cloud hardware.

    https://epochai.org/blog/how-much-does-it-cost-to-train-frontier-ai-models