• @[email protected]
    link
    fedilink
    42 months ago

    I can’t but it’s also not necessary. There are no conditions were no energy from renewables is produced. You have to cover peaks and shift electricity around a bit. The missing parts are interconnection and, dependend on price, overbuilding.

    • @[email protected]
      link
      fedilink
      2
      edit-2
      2 months ago

      I can guarantee you that there are conditions when sun and wind aren’t producing a thing or very low output, like during night you are at mercy of wind (hydro is another story, is more stable but even there we experience droughts). So, what do you do when all three (night, no wind and drought) hit you like for a week?

      Edit: typo

      • @[email protected]
        link
        fedilink
        12 months ago

        In the EU, hydrogen. Either by fuel cell or burnt in hydogen ready NG plants. Wouldn’t be my first choice but thats whats gonna happen.

        • @[email protected]
          link
          fedilink
          12 months ago

          Could be, however hydrogen is really tough to handle plus green generation is around 50% efficiency (something like that). Also imagine having huge hydrogen volume and there is a spark…

            • @[email protected]
              link
              fedilink
              12 months ago

              Strategy doesn’t mean it will be actually implemented or it’s the best. For example, Ursula instructed the transportation guy to try to implement Hyperloop. Shall I say more? :) There is also strategy to ditch fossil fuel cars soon…

                • @[email protected]
                  link
                  fedilink
                  12 months ago

                  You think? I’m saying that we can have a strategy, but that doesn’t guarantee the outcome. Again, show me a city scale energy storage today. So, until we have one, it’s vaporware. Basically this strategy is based on what exactly? Hope?

                  • @[email protected]
                    link
                    fedilink
                    12 months ago

                    The strategy is being implemented, infrastructure being build. Electrolysers and hydrogen ready NGs are planed and build. New NG infrastructure is hydrogen ready. What else are you expecting? Should things magically materialise?