I’m all for putting solar panels all over the place, but won’t these get dusty and oily and need loads of cleaning after trains pass over?

Also, costing €623,000 over three years sounds rather expensive for just 100m (although that roughly equates to 11KW).

  • @[email protected]
    link
    fedilink
    13 hours ago

    about 42 panels per hour. If that includes wiring somehow, that is faster than other solar. Maybe their daily productivity estimate includes scooting out of the way of other trains and less than 24 hours operation.

    • @Valmond
      link
      13 hours ago

      I didn’t knew the problem with ordinary solar was the installation time \s

      How on earth do you “scoot out of the way” of other trains when you yourself is a train?

      I feel you all are just shitting me lol 😂