(⬤ᴥ⬤) to [email protected] • 2 months agoi'm at a losslemmy.blahaj.zoneimagemessage-square149fedilinkarrow-up1556arrow-down133
arrow-up1523arrow-down1imagei'm at a losslemmy.blahaj.zone(⬤ᴥ⬤) to [email protected] • 2 months agomessage-square149fedilink
minus-square@pingvenolinkEnglish3•2 months agoEven if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.
The connection between 2 and 3 is blocked.
Damn, I didn’t even notice that.
Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.
deleted by creator