(⬤ᴥ⬤) to [email protected] • 2 days agoi'm at a losslemmy.blahaj.zoneimagemessage-square148fedilinkarrow-up1535arrow-down133
arrow-up1502arrow-down1imagei'm at a losslemmy.blahaj.zone(⬤ᴥ⬤) to [email protected] • 2 days agomessage-square148fedilink
minus-square@pingvenolinkEnglish3•1 day agoEven if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.
The connection between 2 and 3 is blocked.
Damn, I didn’t even notice that.
Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.