(⬤ᴥ⬤) to [email protected] • 1 month agoi'm at a losslemmy.blahaj.zoneimagemessage-square149fedilinkarrow-up1556arrow-down133
arrow-up1523arrow-down1imagei'm at a losslemmy.blahaj.zone(⬤ᴥ⬤) to [email protected] • 1 month agomessage-square149fedilink
minus-square@pingvenolinkEnglish3•1 month agoEven if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.
Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.