• @pingveno
    link
    English
    31 month ago

    Even if you assume that it is not blocked, it is still 5. The pipe from 2 to 3 is never reached because 4 leaks out the hole in the bottom. Assume that the hole in the bottom is a flaw and 4 still leaks out the top before the pipe to 3 is reached.