@CAVOK to [email protected]English • 1 year agoHow dependent is France on Niger's uranium?www.lemonde.frexternal-linkmessage-square137arrow-up187arrow-down12
arrow-up185arrow-down1external-linkHow dependent is France on Niger's uranium?www.lemonde.fr@CAVOK to [email protected]English • 1 year agomessage-square137
minus-squareSvantelinkfedilink0•1 year ago@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis Anyway, I don’t want anyone to stop building renewables, but I don’t want anyone to stop building nuclear either. We need every option. (Even if nuclear is a safer bet.)
minus-squareAbolishBorderControlsNowlinkfedilink1•1 year ago@Ardubal @matthewtoad43 @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis My understanding was that the #Messmer plan was implemented with no public consultation, debate and with state finance. I’m not sure that would work in the UK or most countries nowadays. #Hinkley was proposed in 2008 as one of 8 reactors and is planed to be completed 2028. So it has taken a long time, the cost has more than doubled and the #energy will be expensive Ultimately, #nuclear will be judged by its record
@matthewtoad43 @MattMastodon @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis
Anyway, I don’t want anyone to stop building renewables, but I don’t want anyone to stop building nuclear either. We need every option.
(Even if nuclear is a safer bet.)
@Ardubal @matthewtoad43 @BrianSmith950 @Pampa @AlexisFR @Wirrvogel @Sodis
My understanding was that the #Messmer plan was implemented with no public consultation, debate and with state finance.
I’m not sure that would work in the UK or most countries nowadays.
#Hinkley was proposed in 2008 as one of 8 reactors and is planed to be completed 2028.
So it has taken a long time, the cost has more than doubled and the #energy will be expensive
Ultimately, #nuclear will be judged by its record