• @schmidtster
    link
    -59 months ago

    Who charges overnight? Everyone just plugs it in when they get home. It’s an issue that can’t just be handwaved away like that.

    Sure stuff can be on a timer, but codes need to be presented, adopted and they need to installed. That takes years, it’s already too late.

    • Nik282000
      link
      fedilink
      79 months ago

      Dude, electric car’s are about 25 computers on wheels. Adding a “charge between hours” function is so trivial I would be surprised if it doesn’t already exist. But no, you’re right, computers are a complicated pipe dream, we should all go back to coal burning, steam powered, difference engines and horseless carriages.

      • @[email protected]
        link
        fedilink
        129 months ago

        I own an EV and there’s definitely a setting in the car to specify what time of day to charge (and my charger itself also has an app where I can specify that time restriction).

        • @schmidtster
          link
          -59 months ago

          Panel and code calculations don’t care about those yet and it’s going to be a long time until they do.

          • @[email protected]
            link
            fedilink
            69 months ago

            It’s fun seeing someone with so little understanding of electricity spreading the misinformation someone else fed them.

            Most houses existing panel have the capacity for a level 2 charger.

            • @Boxtifer
              link
              39 months ago

              100amp or 200amp? I figured a main upgrade will be inevitable with the push to electrify more than the car in houses.

              • @[email protected]
                link
                fedilink
                19 months ago

                Depends, a 200amp nearly for sure has capacity. A 100amp likely does, but depends how electrified they already are, but many smaller houses that still heat with natural gas will have lots of space left in a 100 amp service

            • @schmidtster
              link
              -39 months ago

              Strange, most homes where I live only have 20-50 amp services, neither being enough for a level 2 with all the other required panel loads.

              News flash, codes are different in different places!

      • @schmidtster
        link
        -39 months ago

        Codes and standards need to adopt those functions, right now there is only a couple of code complaint ways to deal with it on a panel end.

        • @Boxtifer
          link
          49 months ago

          Can you explain why that matters if the hardware at the charger could initiate and control all that?

          • @schmidtster
            link
            -19 months ago

            If it’s permanently installed it’s potential needs to be accounted for at all times, there is some conditionals, like ignoring AC during winter, but there’s nothing for intermittent loads, since it can still potentially be done at anytime.