NuScale and its primary partner give up on its first installation.

  • @[email protected]
    link
    fedilink
    12
    edit-2
    1 year ago

    Also according to the guardian the project had massive cost overruns increasing the costs by a factor of five:

    The projected cost of the NuScale project had blown out from US$3.6bn for 720 megawatts in 2020 to US$9.3bn for 462MW last year.

    https://www.theguardian.com/australia-news/2023/nov/09/small-modular-nuclear-reactor-that-was-hailed-by-coalition-as-future-cancelled-due-to-rising-costs

    To answer your idea solar costs on a MW bases 30times less today, with falling prices. Solar runs something like 20-25% of the time and you need storage, but that is still much much cheaper then this nuclear plant would be. So you are really wasting money going for nuclear today.

    • @[email protected]M
      link
      fedilink
      41 year ago

      Exactly. Nuclear is quite expensive compared with wind, solar, and short-term storage. The only place new nuclear might make sense is as a competitor for longer-duration storage, and then only if it’s able to come in more cheaply than people know how to build it.

      • @[email protected]
        link
        fedilink
        61 year ago

        Nowadays a big problem with nuclear is that as almost no new reactors are built the expertise to build them has disappeared so it always leads to these huge cost overruns.