• @[email protected]
    link
    fedilink
    611 months ago

    Power company asked if I wanted a three phase meter when I was checking power requirements for wiring my shop up.

    I just needed a different meter.

    • @[email protected]
      link
      fedilink
      311 months ago

      Usually it’s the meter and the cabling that needs changing, like an extra phase needs to be introduced but it should be available at street level if any commercial place is around.

      Your shop might have had the cables already and just needed the meter change.