Keeping tradition with doing things backwards, I’ve finally got a UPS for the rack (mounted in the bottom of the stack). Got a PowerWalker VI 2200R. Its a 2U unit which is all the space I’ve got left in the rack. Decent price and decent I/O with USB, serial and a slot-in for network expansion + 4 IEC outputs. Its powering everything in the rack and connected via USB to my main server which runs a NUT server that other machines can connect to. A calibration run (100-80%) puts the runtime at about 20 min. Long enough that I’m comfortable setting things to shut down when 20% capacity remains. Summary, I sleep better now.

The rack with the UPS at the bottom

NUT output

  • @[email protected]
    link
    fedilink
    58 months ago

    I was so confused about a package delivery. I opened the thread, saw Self Hosted, and suddenly everything clicked.

    Cheers to nice cable management. Don’t look at the mess below my desk.

    • @wreckedcarzz
      link
      English
      38 months ago

      I prefer my power delivered by FedEx myself