    There are already some charging stations in Germany offering 400kW. Still 16 minutes though. 800kW is just insane. CCS is currently capped at 500kW, so you would need MCS which is planned for trucks.

    • Dave.
      link
      fedilink
      English
      95 months ago

      Fucking hell, imagine the requirement of a couple of megawatt substation for fast charging, urban power planners must be shitting themselves.

      • @RememberTheApollo_
        link
        English
        45 months ago

        Urban probably isn’t too bad, if it’s a proper city they already have power for the infrastructure of subways, lighting, and large buildings.

        Where it’s going to be tough is putting these in the ‘burbs or the large areas of mostly vacant interstate. There’s just no infrastructure for them to build off of, and EV charging infrastructure is already one of the issues holding people back from more widely adopting them.

        • Dave.
          link
          fedilink
          English
          45 months ago

          Yeah, just the random added load equivalent to 80-100 houses per car, any time between 5am and 9pm would be enough to send local suburban grids into a spin, especially in summer evenings when there’s peak loading already underway. A lot of infrastructure would need to be beefed up to make it reliable.

          • @RememberTheApollo_
            link
            English
            7
            edit-2
            5 months ago

            We have an EV that charges on 110v current. It’s not fast, but plugged in the previous evening it will be ready to go by morning. Not a huge draw on the grid off household current. Obviously, just like you point out, more EV will increase demand…but charging off 110v overnight isn’t going to be as demanding as a “gas station” for EV that all want fast charge for people that maybe don’t have charging access otherwise.

            I imagine there would have to be some sort of organized system to pick charging time slots via the local electricity provider in order to keep the grid stable. EV owners could certainly get an electrical timer or via the EV manufacturer app to set a charging time.

            • Dave.
              link
              fedilink
              English
              15 months ago

              Yeah if you’ve got home charging it’s not a real issue. We use 240v here in Aus so you can pull quite a bit out of domestic outlets before having to get serious and generally overnight charging to top up the day’s commute would be fine.

              So it wouldn’t be a fast charger on every street, and you could always enforce limits by time of use pricing to put a dampener on peak loads.

              I just wonder if utility planners might get caught with their pants down on this one. Like, could you say 5 years ago chargers might run to 800kW?

              • @RememberTheApollo_
                link
                English
                35 months ago

                I’d say grid planners everywhere are under serious strain. The demands for air conditioning in public and private spaces are getting higher, the number of household electronics is climbing along with data centers constantly consuming ever more amounts of electricity…now we add EV charging to the mix.

                Yeah, I’d say they haven’t been able to keep up.

        • @Freefall
          link
          English
          25 months ago

          lol, I am picturing buried thorium salt reactors at charging stations in the boonies.

        • SeaJ
          link
          fedilink
          English
          15 months ago

          Many rural areas honestly would not be too bad since power plants are usually out there. Those generally tend to have pretty decent power infrastructure. It might be different in other states though. Here in Washington dams and wind farms tend to be pretty far out of town.

          • @RememberTheApollo_
            link
            English
            15 months ago

            That’s fine if you’re lucky enough to have a power plant nearby, but they aren’t exactly evenly scattered about for the benefit of building EV charging infrastructure.

      • @tmjaea
        link
        English
        15 months ago

        I think in some years it’s considered a common requirement. Just compare it to pipelines. Electricity is way more easily transported and still we built tens of thousands of [preferred unit for distance measurement] of tubes on to the landscape.

      • @Freefall
        link
        English
        15 months ago

        Replace the gas stations with that stuff and have a charging network distributed around parking areas.

    • @[email protected]
      link
      fedilink
      English
      5
      edit-2
      5 months ago

      If you do the math, the common standard plugs simply can’t do the charging rates that would be required here. You’d need a whole new plug design on top of all new chargers.

      It’s also silly and unnecessary. We should focus on getting more chargers out there, not chasing a fast charge time goal. If you plan your route out a bit, 20-30 minute charge times every 2-4 hours are fine for the vast majority of people.

      https://wumpus-cave.net/post/2024/03/2024-03-30-ten-minute-ev-charging-wont-happen/index.html

      • @[email protected]
        link
        fedilink
        English
        45 months ago

        According to this: https://en.m.wikipedia.org/wiki/IEC_62196 the standard was updated in 2022 to support up to 1500V and 800A. If this can be achieved simultaneously it would be 1.2MW.

        Whether it is necessary or realistic is another thing, but seems to be achievable without even changing the plug.